Talk:Geothermal energy
This is the talk page for discussing improvements to the Geothermal energy article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
Archives: 1, 2Auto-archiving period: 365 days |
Geothermal energy was one of the Engineering and technology good articles, but it has been removed from the list. There are suggestions below for improving the article to meet the good article criteria. Once these issues have been addressed, the article can be renominated. Editors may also seek a reassessment of the decision if they believe there was a mistake. | ||||||||||||||||
| ||||||||||||||||
Current status: Delisted good article |
This article is rated B-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||||||||||||||||||||
|
You can help expand this article with text translated from the corresponding article in German. Click [show] for important translation instructions.
|
Maths Error
[edit]"Estimates of the electricity generating potential of geothermal energy vary six–fold, from .035 to 2 TW depending on the scale of investments." - That's a factor of sixty, not six. — Preceding unsigned comment added by 66.61.117.39 (talk) 02:53, 4 September 2010
Move discussion in progress
[edit]There is a move discussion in progress on Talk:Geothermal electricity which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 17:31,4 August 2016 (UTC)
GA Reassessment
[edit]- This discussion is transcluded from Talk:Geothermal energy/GA2. The edit link for this section can be used to add comments to the reassessment.
Broad in its coverage?
[edit]Consider the placement of info between this article and the more detailed Geothermal power and Geothermal heating
For example:
Duplication of "Installed geothermal electric capacity" table
Should all the environmental effects and "Geothermal drilling risks" be put here rather than split
Should all the economics be put here
Are there some things here which should be moved to one of the other articles e.g. New Zealand electricity
Are EGS only for electricity?
Add a bit more on reinjection e.g. CO2
Add a bit more on possible future developments e.g. going deeper, hydrogen https://www.thinkgeoenergy.com/green-hydrogen-geothermals-route-to-pseudo-commoditization/
As geothermal is not mentioned in the Cogeneration article a cogeneration section should be written here I think probably also explaining MW vs MWth
Other
[edit]Various tags need dealing with the most important being that the economics section needs a major update
Consider adding a couple of sentences to history section re any significant 2010s developments
Delete 2015 table?
Trim the bibliography and make sure up to date
Do or delete "to do" list and translation mentioned on talk page
If these are all fixed I may add a few more minor comments Chidgk1 (talk) 17:42, 17 December 2021 (UTC)
- Thanks for your edit FUchesco but unfortunately no one else came to help so this article is no longer good. Chidgk1 (talk) 14:17, 5 January 2022 (UTC)
Citation error
[edit]I am evaluating an article for a class, and I chose to evaluate citations. I found that citation #3 states that the information given was in chapter 1, but when searching I could not find that information. I searched a few other chapters and did not find that information in any of them PNWAnthroNut (talk) 19:25, 16 February 2024 (UTC)
Cost of Drilling Math Wrong?
[edit]Hey, if the failure rate of drilling is 20%, and the cost of drilling at all is $10M, then the cost of drilling, once accounting for failures is $12.5M not $50M: $10M + $10M * 0.2. I think the author used $10M / 0.2 instead.
I'm not an expert here though. Can someone confirm the cost is truly $12,500,000 USD? BlackVegetable (talk) 16:28, 26 June 2024 (UTC)
Oh that's embarrassing. I showed my work wrong. Urgh, too tired to fix it. Basically every four drills has to pay for the fifth failure, so each would add 25%, not 20% to their costs.
- Delisted good articles
- Old requests for peer review
- B-Class physics articles
- Mid-importance physics articles
- B-Class physics articles of Mid-importance
- B-Class energy articles
- High-importance energy articles
- B-Class Geology articles
- High-importance Geology articles
- High-importance B-Class Geology articles
- WikiProject Geology articles
- Articles copy edited by the Guild of Copy Editors
- B-Class Climate change articles
- High-importance Climate change articles
- WikiProject Climate change articles
- Wikipedia pages with to-do lists